So, I'm not going to say much about My 5 day keelboat course taken at JWorld in Annapolis, Maryland because I've already told everyone I know about it, but it was a great experience....exhausting, painful, draining....and a lot of fun. I was amazed that I didn't get sea sick at all. Then it was off to the boat. I had 3 projects I wanted to get started on while in Virginia working on my boat:
1. All 6 through hull seacocks were frozen open. Need to unfreeze them.
2. The anchor locker chainplate had a chunk of it rusted out and needed to be coated with Ospho (a chemical that turns rust back into iron) and then painted with a polyurethane paint to stop any further deterioration.
3. Inspect the standing rigging.
4. Vberth water tank had issues (see future posts).
So, I did get 4 seacocks unstuck...I thought I had unfrozen a 5th but it only moved a little then quit moving. So 2 seacocks left to deal with. Also, I got a wire brush and brushed the rust off of the chainplate but that is all I did. I did look at the standing rigging and found it to be in good shape.
Back to Saudi.......
1. All 6 through hull seacocks were frozen open. Need to unfreeze them.
2. The anchor locker chainplate had a chunk of it rusted out and needed to be coated with Ospho (a chemical that turns rust back into iron) and then painted with a polyurethane paint to stop any further deterioration.
3. Inspect the standing rigging.
4. Vberth water tank had issues (see future posts).
So, I did get 4 seacocks unstuck...I thought I had unfrozen a 5th but it only moved a little then quit moving. So 2 seacocks left to deal with. Also, I got a wire brush and brushed the rust off of the chainplate but that is all I did. I did look at the standing rigging and found it to be in good shape.
Back to Saudi.......